Surveyors taking measurements inside a brick-walled building before entry works
Building surveys

The Importance of Pre-Entry Surveys.

A pre-entry survey records a building before design, fit-out or occupation begins. Here is why it is worth doing first, and what it should cover.

5 min read

1. Introduction

A pre-entry survey is carried out before a team starts design or construction work in a building, or before a tenant takes possession. It captures the layout, dimensions and condition of the space as it stands, so that everyone begins from the same, verified information.

Two surveyors in hi-vis measuring a commercial office with a laser measure and a tablet
Surveying before work starts gives the whole project team a reliable baseline.

2. Why survey first?

  • Reduce abortive design. Designing from assumed dimensions often means redrawing once the real building is found to differ.
  • Spot constraints early. Level changes, columns, services and awkward geometry are far easier to deal with before the design is fixed.
  • Set a baseline. A dated record of the existing building and its condition helps resolve questions about damage or alterations later.
  • Support approvals. Accurate existing drawings are the starting point for planning and building regulations submissions.
  • Save time on site. Contractors who price and plan from accurate drawings face fewer variations.

3. Who benefits

Pre-entry surveys are useful to architects and designers starting a scheme, contractors preparing a fit-out, landlords and agents marketing space, and tenants who want an agreed record of a unit before they take it on. See our guide to GIA and NIA floor plans for how the areas are measured.

4. What a pre-entry survey covers

  • measured floor plans of each level, with key dimensions;
  • elevations and sections where the design requires them;
  • floor-to-ceiling heights and level changes;
  • location of columns, openings, stairs and other fixed features;
  • a photographic record of the space and its visible condition;
  • a point cloud for future reference, if required.

Note that a measured survey records geometry and visible condition. It is not a structural or building defects survey, which should be carried out separately where needed.

5. FAQs

When should the survey take place?

As early as practical: before design starts, before a fit-out is priced, or before keys are handed over.

Does the survey include a condition report?

We record visible condition photographically. A full building condition or structural survey is a separate service.

How long does it take?

Most spaces can be surveyed on site in a day or less. We will confirm the programme with your quote.

Can you survey occupied or live buildings?

Yes. We work around occupants and agree timings and access in advance.

Related articles

View all insights
CGI of a commercial business centre at dusk with a glazed, bronze-clad facade
Insight

Visual Communication in Planning

How 3D visuals and CGI help communicate design intent to planners and stakeholders.

Read article
Hand-drawn measured survey plan of a commercial ground floor with dimensions on squared paper
Guides

What's Included in a Measured Building Survey?

A breakdown of typical deliverables, from CAD floor plans and elevations to point clouds and reports.

Read article
Second floor office plan with furniture layout, key and room schedule
Guides

Understanding GIA and NIA Floor Plans

A clear guide to Gross Internal Area and Net Internal Area.

Read article

Discuss your
project requirements.

Talk to our team about measured surveys, architectural design or 3D visualisation. We'd be happy to help.

Request a quote